Title
Video #
Length
TRANSFORMER CONNECTIONS AND BANKING
E-1
15 min.
Synopsis:
Very basic video with workbook showing hands-on training in the various types of transformer connections used by the Memphis Light, Gas & Water Division.

Title
Video #
Length
DEADEND INSULATOR CHANGEOUT USING RUBBER GLOVES FROM INSULATED PLATFORM
E-2
17 min.
Synopsis:
The distribution deadend insulators are removed utilizing a tension puller and nylon slings. One of the linemen works from an insulated platform. All energized portions of the system are covered with safety coverup.

Title
Video #
Length
INSULATOR & CROSSARM CHANGEOUT USING RUBBER GLOVES FROM ARIAL DEVICE
E-3
28 min.
Synopsis:
The objective here is lifting and securing one conductor clear of its insulator. The method uses a temporary conductor holder, rubber gloves and an aerial device on a tangent structure.

Title
Video #
Length
RECONDUCTORING OR UPGRADING VOLTAGE EXTENSION ARMS FROM AN ARIAL DEVICE
E-4
21 min.
Synopsis:
This training procedure shows how to move conductors in preparation for reconductoring or upgrading the voltage, using extension arms, rubber gloves and an aerial device.

Title
Video #
Length
SINGLE INSULATOR CHANGEOUT - RUBBER GLOVES FROM AERIAL DEVICE
E-5
14 min.
Synopsis:
The objective is lifting and securing one conductor clear of its insulator. The method uses a temporary conductor holder, rubber gloves and an aerial device on a tangent structure.

Title
Video #
Length
TEMPORARY GROUNDING FOR DE- ENERGIZED MAINTENANCE
E-6
26 min.
Synopsis:
Demonstrates procedures for gounding an overhead distribution line on a tangent structure, a vertical running corner and a vertical dead-end. Appropriate safety procedures are also reviewed.

Title
Video #
Length
CUTTING IN A DISCONNECT SWITCH- RUBBER GLOVE METHOD
E-7
32 min.
Synopsis:
Illustrates the installation of a disconnect switch into each phase conductor. Rubber gloves are used while working from an insulated platform.

Title
Video #
Length
CARE & MAINTENANCE OF TOOLS & PROTECTIVE EQUIPMENT
E-8
32 min.
Synopsis:
The first section deals with the care and maintenance of tools and protective equipment in the field. The second part covers the care and repair of tools and protective equipment carried out by the lineman at the warehouse shop.

Title
Video #
Length
POLE REPLACEMENT - RUBBER GLOVES FROM AERIAL DEVICE
E-9
38 min.
Synopsis:
Procedure shows how to lift and secure conductors to a new pole, using rubber gloves and an aerial device.

Title
Video #
Length
HAZARDS OF INDUCED VOLTAGE
E-10
40 min.
Synopsis:
A demonstration of all extablished safety rules and regulations when installing or removing protective grounds. This presen- tation explains the electrical phenomenon which creates induced voltage.

Title
Video #
Length
HANDLINE RESCUE and
ELECTRIC POWER LINE COMPRESSION CONNECTORS AND TOOLS
E-14
14 min.
1 hr. 18 min.
Synopsis:
ZAP! A lineman makes contact while at poletop and is now unconscious. With proper technique, one man can get him down. Seminar on what makes a poor squeeze-on connection and how to keep tools in top shape.

Title
Video #
Length
MEET A.R.T.
E-15
10 min.
Synopsis:
Four linemen devise a most ingenious way to remove a stricken comrade from a hydraulic bucket truck. A must see for all bucket truck crews.

Title
Video #
Length
CONFIDENCE
E-16
11 min.
Synopsis:
Rubber glove testing.

Title
Video #
Length
FIELD INSPECTION
E-17
10 min.
Synopsis:
Proper car of rubber protective equipment.

Title
Video #
Length
GUIDES TO GROUNDING
E-18
12 min.
Synopsis:
Methods of using personal grounds.

Title
Video #
Length
HOT STICK CARE
E-19
9 min.
Synopsis:
Care of hot sticks.

Title
Video #
Length
USE OF COTTON CLOTHING FOR LINEMEN
E-20
10 min.
Synopsis:
Testimonial from an accident victim.