|
|
|
Title
|
Video
#
|
Length
|
| PROFESSIONAL
TREE CARE SAFETY - 2 |
E-41
|
25
min.
|
|
Synopsis:
Second
of series of 4 videos, deals with Personal Protection. Addressses
many common hazards tree care workers en- counter and how the
hazards can be safely dealt with. Subjects include the importance
of wearing protective gear such as hard hats, eye protection,
ear protection and the use of breathing respirators. Proper procedures
for the inspection and use of climbing equipment is also covered.
|
|
Title
|
Video
#
|
Length
|
| PROFESSIONAL
TREE CARE SAFETY - 3 |
E-42
|
28
min.
|
|
Synopsis:
Third
in series of 4 videos, deals with Equipment Safety. Details safety
consideration for the use of aerial lifts, stump cutters, tree
cranes, chippers and chain saws. Tape also teaches how to safely
control traffic at the work site by utilizing men working signs,
traffic cones and flagging procedures.
|
|
Title
|
Video
#
|
Length
|
| PROFESSIONAL
TREE CARE - 4 |
E-43
|
20
min.
|
|
Synopsis:
Last
of series of 4 videos, deals with Operational Practices. Teaches
the importance of job safety and its positive impact on productivity
and quality of work. Demonstrates recommended safe working practices
for tree care work.
|
|
Title
|
Video
#
|
Length
|
| ONE
MAN BUCKET RESCUE |
E-44
|
17
min.
|
|
Synopsis:
Teaches
techniques used by Philadelphia Electric Company to rescue an
injured person from an elevated aerial lift unit.
|
|
Title
|
Video
#
|
Length
|
| THE
LINEMAN TODAY |
E-45
|
29
min.
|
|
Synopsis:
Provides
an understanding of the pole climbing equipment used by linemen.
Explains how the equipment should be fitted for individual safety
and comfort, proper techniques for use and inspection and maintenance
considerations. Part 1 - Proper Fit, 11 minutes; Part 2 - Techniques
for Safe Use, 7 minutes; Part 3 - Inspection and Maintenance,
11 minutes.
|
|
Title
|
Video
#
|
Length
|
|
SAFETY
AWARENESS AROUND ELECTRICAL CONDUCTORS and
MOMENTS
|
E-46
|
13
min.
19 min.
|
|
Synopsis:
Identifies
electrical hazards associated with work performed around underground
and overhead electrical conductors. The importance of pre-work
job briefings also covered in detail. Emotionally charged video
telling the story of three different electrocution accidents that
resulted from indirect contacts with energized conductors. Part
1 - The Lineman, 7 minutes; Part 2 - The Repairman, 6 minutes;
Part 3 - The Crane Operator, 6 min.
|
|
Title
|
Video
#
|
Length
|
| BRUSH
CUTTER SAFETY |
E-47
|
6
min.
|
|
Synopsis:
Teaches
safe operating procedures for the use of blade and string type
brush cutting equipment. Produced by Stihl Chain Saw.
|
|
Title
|
Video
#
|
Length
|
| HAVE
YOU CHECKED? |
E-48
|
15
min.
|
|
Synopsis:
Fault
currents and meters. Phase to phase faults, affects of fault currents
on meters and how to install meters safely.
|
|
Title
|
Video
#
|
Length
|
| CAPACITOR
AND CAPACITOR SWITCHING |
E-52
|
13
min.
|
|
Synopsis:
Capacitor
and capacitor switching in a substation. Discussion of Power Factor,
relationship of real power (kw), reactive power (kvar) and apparent
power (kva).
|
|
Title
|
Video
#
|
Length
|
| BASIC
METERS - PART 1 |
E-53
|
25
min.
|
| Synopsis:
Introduction
to single-phase watt-hour meters. |
|
Title
|
Video
#
|
Length
|
| TRANSFORMERS
AND SINGLE PHASE CONNECTIONS |
E-54
|
19
min.
|
|
Synopsis:
Introduction
to transformers and single-phase transformer connections.
|
|
Title
|
Video
#
|
Length
|
| BASIC
CAPACITORS |
E-55
|
50
min.
|
| Synopsis:
Capacitors
in electrical distribution systems, how they are made and how
they work. |
|
Title
|
Video
#
|
Length
|
| BASIC
METERS - PART 2 |
E-57
|
30
min.
|
|
Synopsis:
Follow
up on Basic Meters - Part 1 (E-53). Metering 3-wire single phase
services.
|
|
Title
|
Video
#
|
Length
|
| OSHA
AND THE BASKET TRUCK |
E-58
|
13
min.
|
|
Synopsis:
OSHA
regulations and their applications as they apply to aerial basket
trucks in an electric utility.
|
|
Title
|
Video
#
|
Length
|
| METERS
- PART 3 |
E-59
|
25
min.
|
|
Synopsis:
Discussion
on metering 3-phase Delta.
|
|
Title
|
Video
#
|
Length
|
| METERS
- PART 4 |
E-60
|
22
min.
|
|
Synopsis:
Discussion
on 3-phase, 4-wire wye and 3-wire network.
|
|