Title
Video #
Length
GAS LEAK RESPONSE PLAN
G-1
18 min.
Synopsis:
When a customer calls the Memphis information center to complain of gas odors that may be a result of a gas leak, an emer- gency plan is used to prevent a possible explosion. The video documents the plan in action and my be used for training all employees on the safe and efficient procedures for locating and repairing all gas leaks.

Title
Video #
Length
PRAGMATICS, INC.
G-2
1 hr. 16 min.
Synopsis:
Introduction to the firm's produce line for gas leak surveys, field analysis - model 653, 12 minutes; Nidek 895, 12 minutes, model 856, 16 minutes; model 856/Sensor, 22 minutes. Introductory material, 14 minutes.

Title
Video #
Length
WORKING MONITORS
G-3
10 min.
Synopsis:
The components and configuration of a working monitor pressure reducing station are explained in this demonstration. Through the use of switching valves added to the working monitor station to initiate failure, the viewer is able to see how each of the two regulators are able to control the outlet pressure to the desired setpoint in the event either of the regulators should fail. Points out the advantages of this style of pressure reduction.

Title
Video #
Length
THE NATURAL GAS INDUSTRY
G-4
8 min.
Synopsis:
Outlines the history of natural gas and the role of the Gas Research Institute in the gas industry.

Title
Video #
Length
GAS RESEARCH INSTITUTE MULTI- FAMILY PIPING APPLICATIONS
G-5
15 min.
Synopsis:
Shows innovative interior gas piping systems for multi-family buildings (use of corrugated stainless steel which is flexible vs. "black steel" piping.

Title
Video #
Length
RESULTS OF RESEARCH PROJECTS ON PLASTIC PIPING USED FOR GAS DISTRIBUTION
G-6
47 min.
Synopsis:
4 segments. 19 minute segment on butt heat-fusion joining practices which discusses the variables involved with heat fusing plastic pipes. 7 minute segment focuses on Gas Research Institute Field Failure Reference Catalog which is a tool to help utilities determine the case and mode of a pipe failure. 10 minute segment describes the method for implementing the Con- stant Tensile Load Test which can be used by utilities for acceptance or quality assurance testing of polyethylene pipe. A final 11 minute segment addresses the results of research into the effects of aging on plastic pipe.

Title
Video #
Length
NATURAL GAS SAFETY: INSTALLATION PART 1
G-7
14 min.
Synopsis:
1st of a series of 10 videos on natural gas safety, produced in 1986 by the Arizona Corporation Commission. This video discusses the necessity of having good design plans and what material standards must be met. Also discusses selection of plastic pipe; standards for burial, trace wiring; andoless and andole risers.

Title
Video #
Length
NATURAL GAS SAFETY: JOINING PROCEDURES - PART 2
G-8
18 min.
Synopsis:
Discusses need for qualified joining prodedures, recordkeeping requirements, joiner qualification, procedures for joining both steel and plastic pipe.

Title
Video #
Length
NATURAL GAS SAFETY: QUALIFIED PERSONNEL - PART 3
G-9
13 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: LEAK SURVEYS PART 4
G-10
13 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: CORROSION PROTECTION - PART 5
G-11
12 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: OVERPRESSSURE PROTECTION - PART 6
G-12
11 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: OPERATING & MAINTENANCE PLAN - PART 7
G-13
13 1/2 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: SAFETY & EMERGENCY PLAN - PART 8
G-14
11 1/2 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: ONE CALL SYS- TEM & DAMAGE PREVENTION - PART 9
G-15
22 min.
Synopsis:
None Available

Title
Video #
Length
NATURAL GAS SAFETY: STAYING SAFE/ OVERVIEW - PART 10
G-16
16 min.
Synopsis:
None Available

Title
Video #
Length
STATIC ELECTRICITY AND PLASTIC PIPE
G-17
28 min.
Synopsis:
Excellent video on relationship of static charges and discharges on plastic pipe.

Title
Video #
Length
IMPROVED FIELD PROCEDURES FOR SQUEEZE-OFF OF POLYETHYLENE GAS PIPES
G-18
21 min.
Synopsis:
Summarizes the results of the Gas Research Institute sponsored research aimed at developing improved squeeze-off guide- lines and procedures for polyethylene gas pipes. Video presents guidelines of squeeze-off geometry, amount of squeeze, tool release rate, and PE pipe materials. Also describes a method that may be adapted for qualifying squeeze-off procedures.

Title
Video #
Length
GUIDELINES ON BUTT HEAT FUSION
G-19
10 min.
Synopsis:
Joining of polyethylene gas pipe.

Title
Video #
Length
GUIDELINES ON SOCKET HEAT FUSION
G-20
15 min.
Synopsis:
Joining of polyethylene gas pipe.

Title
Video #
Length
GUIDELINES ON SADDLE HEAT FUSION
G-21
10 min.
Synopsis:
Joining of polyethylene gas pipe.

Title
Video #
Length
THE NEW VENT SIZING TABLES
G-22
12 min.
Synopsis:
Describes the new tables developed for determining the proper diameter of vents on Category 1 appliances. Background material is presented to define the 4 categories of appliances, the conditions for condensation from furnace exhaust gases, its potential for corrosion, and the need for using the new set of tables to determine the correct diameter for appliance vent systems. Venting of multiple appliances and systems that include masonry chimneys are also briefly discussed.